Electric Boat Coating Facility Quonset Point, RI


Fast Track Submarine Coating Facility
Project Features
  • Design Build project completed in a fast track 20 week period.
  • 100' Highbay industrial building constructed adjacent to two existing facilities.
  • Elevated equipment slab at 70' above finished floor.
  • Two 63' x 70' Mega Doors.
  • Structural slab design for 44,400 PSF loading.