PDS completed a large scale pre-engineered metal building addition to Electro Methods which consists of production and warehouse space. There is also rooms built for air flow, programming, inspection, equipment and a mezzanine to include offices. The building has three overhead doors, windows, six pass doors, 24 gauge standing seam roof, 26 gauge siding panel and a 4’ concrete kicker wall.