Impact Plastics

  • Putnam, CT
  • Industrial, Pre-Engineered Metal Buildings
  • Renovation & Addition
  • 13,000 Sq. Ft

Project Features:

  • PDS constructed a new two-story metal building addition with an overhead door and an elevator.
  • The first floor includes office space, break rooms, restrooms, lab space and a reception area.
  • The second floor consists of high end outdoor patio, conference rooms, offices and restrooms.

Related Projects

Kamatics

Kamatics

+

Bloomfield, CT

Polamer Precision, Inc.

Polamer Precision, Inc.

+

New Britain, CT

Electro Methods

Electro Methods

+

South Windsor, CT

Kaman Corporation Building 41

Kaman Corporation Building 41

+

Bloomfield, CT

Trevisan

Trevisan

+

Suffield, CT

Hazardville Water

Hazardville Water

+

Enfield, CT