-
Industrial, Pre-Engineered Metal Buildings
- PDS built a 7,340 square foot pre-engineered metal building that serves as a hemp processing facility.
- The building has three overhead doors, two windows, four pass doors and two sets of stairs that lead to a 2,000 square foot mezzanine.
Bloomfield, CT
New Britain, CT
South Windsor, CT
Bloomfield, CT
Putnam, CT
Suffield, CT